This type of machine is specialized in vegetable and cormcutting. It is easily operating for woman. It is also the necessary facility for restaurants and second processing factories. Instantaneous ability is above 15 people. This machine will let you have satisfied feeling.

 

A.   Processing material

    Potatoes, carrots, melons, bamboos, onions, apples, vegetables and so on.

 

B. Processing dimension:

(standard)

               H                 10. 15. 20mm cubes or bars.

L              T            (special dimension)

                             3-20mm cubes or bars.

 

C. Capacity

15/mm cubes;    1000kg/hr

 

D.   Voltage

3 phase / 415V, 50Hz / 4P / 0.75KW

(each countries has different voltage connection)

E.   Machine dimension & weight

L 800×W 700×H 1260mm

 

F. Cutting work outline

    Connecting “ON” switch, add little water when machine is running and put suitable amount of material to the machine. (Material diameter under 8/cm). Leaf blade will turn over the material to the fixed thickness of the place of flate cutter. And crosscut cutter will cut the bars into cubes and flow down to the machine after round cutter cuts material into bars. Easily operate, and processing material is clean and delicacy.

 

 

 

 

 

 

 

 

 

 

 

G. Voltage connection

    Power: 3 phase / 415V / 4P / 0.75KW. Connect power cord (red, black, white) when use the machine. Then connect (green) line to insurance after that start to operating.

 B

 

 

 

 

 

               A

 

(1) The power line A connected to power supply. (Attention the    motor shift)

(Attention 4 power lines, green for the grounding line.)

(2) Water pipeline will be connected B, then the installation is completed.

 

 

 

H.   Installing location

    Consider whether the water drains unimpededly or not when install the machine.

 

I.   Watch out the machine running

    Make sure there are no foreign objects on the entrance of the machine and inside of the leaf blade after connecting voltage to avoid the cutter broken while the machine running. Make sure the direction of leaf blade is correct, rith circum gyratoin (clock-wise).

 

J. Method of adjusting thickness of flate cutting

The standard allocation method as follows: (if cut cube is formed by three Cutter)

(1) The first knife (cutting thickness): Plane broadswords Z.     (Adjustable by cutting thickness)

(2)   The second knife (cutting width): Circular knife Group Y.

  5mmP (space): 5mm

 10mmP (space): 10mm

 15mmP (space): 15mm

 20mmP (space): 20mm

 

(3)   The third knife (cut length): transverse plane knife Group.

5mm uses 15 knife group

10mm uses 8 knife group

15mm uses 6 knife group

20mm uses 4 knife group

 

K.   Method of adjusting aluminum fence

Aluminum fence feeds material to crosscut cutter when round cutter cuts the material. This is why the sharp place of aluminum fence has to get close to the cushion of gap of round cutter or the dimension of aluminum fence marks on the bottom right side.

 

L. Round cutter discharging

Round cutter dimension drawing

Round cutter dimension

 

 

Standard (mm)

P: 10

P: 15

P: 20

Special (mm)

P: 3-20

(1) Avert black screw of fixed eccentric axis.

(2) Pull down the fixed bolt of round cutter eccentric axis. Then round cutter can be discharged.

(3) Fix the u-shape spanner on the round cutter set, then loosen sexangular on the round cutter axis (two sides of 24m/m spanner), then it can be taken out.

 

 

 

M. Crosscut cutter discharge

Crosscut cubes round piece

5m/m uses 21 pieces

10m/m uses 8 pieces

15m/m uses 6 pieces

20m/m uses 4 pieces

(1) Fix u-shape spanner on the fixed crosscut cutter set when discharge crosscut cutter. Then loosen sexangular screw (24m/m spanner), then it can be taken out.

 

N. Daily cleansing

    Clean the machine after finish the jobs. Run the machine while operating, then wash it by flush water to clean the leavings.

O.   Standard by-products:

Spanner         10, 19, 24………….3

Screwdriver (-), (+)……….……………2

U-shape spanner                 1 PCS

Lubricant oil                    1

Tool box                       1 box

久久无码人妻一区二区三区| 国内精品人妻无码久久久影院蜜桃| 精品爆乳一区二区三区无码AV| 午夜性做爰A片免费看| 国产第一页屁屁影院| 少妇SPA按摩按出水了| 欧美精品精品一区在线发布| 国产乱人伦偷精品视频免下载| 麻豆蜜桃国产精品无码视频| 欧美激情精品久久久久久| 高清VPSWINDOWS另类乱| 性欧美乱熟妇XXXX白浆| 国产手机拍视频推荐2023| 宫交拔不出来H| 国产无套白浆一区二区| 女学生小嫩嫩裸体视频高清WWW| 一路向西在线播放| 麻豆高清免费国产一区| 精品人妻无码一区二区三区淑枝| 一个人看的www免费视频| 亚洲熟妇无码另类久久久| 国产亚洲精品久久久久久久软件| 坐在办公椅上悄悄做的运动| 欧美老熟妇乱大交XXXXX| 久久久久久九九99精品| 人妻 丝袜美腿 中文字幕| 大肥波BBWWHBBWW| 一边吃奶一边添P好爽视频| 两根大肉大捧一进一出好爽视频| 正文第1章初尝云雨| 草草久久久无码国产专区| 粗暴进入娇小呻吟痛呼| 撕开胸罩一边亲一边摸| 免费看美女被靠到爽的视频| 国产精品久久久久婷婷五月色婷婷| 无人视频在线观看完整版高清| 亚洲AV在线观看| 国产AV无码专区亚洲AV毛网站| 女公务员人妻呻吟求饶| 被C哭着爬走又被拉回来挺进H| 国产精品成人一区二区三区|